What are the heating for the EBICO's Burner?

What are the heating for the EBICO's Burner?

2019-11-19 13:11:37

  Research and explore a variety of energy joint scheduling.To study the joint optimization operation of thermal power and renewable energy on a pilot basis, and explore the formation of a joint dispatching unit for renewable energy power stations and thermal power plants.The joint dispatching unit is regarded as participating in the power market as a whole and accepting the instructions of the grid dispatching agency.In areas where hydropower is the main source of wind power and photovoltaic power, and in areas where wind power and photovoltaic power are developed simultaneously, pilot joint dispatching units that prevent coordinated operation of multiple power sources by region can be explored.We will encourage new nuclear power projects to build peak-regulating power supplies, such as pumped storage, in combination with local conditions.

  In order to achieve environmental protection and low nitrogen emission, gas boiler should consider from three aspects. First, confirm whether the furnace meets the needs of low nitrogen combustion from the heat load parameters of furnace volume and furnace size.Second, confirm the application of low nitrogen combustion technology from the perspective of burner and report the test results in actual use;Three related equipment matching to confirm its rationality from a combustion system, such as single and double fan parameters, flue gas recycling rate, smoke wind mixing way, the precipitation of condensate solution, cold air heating measures, FGR flame stability, FGR impact on the boiler thermal efficiency and so on, analyzed and equipment selection of boiler running safety, stability, the influence of load rate, especially the FGR flame stability of furnace vibration influence;Finally, the conclusion is drawn whether the selected boiler meets the requirement of low nitrogen environmental protection emission.

  For large water tube boilers, mixing of FGR recirculated flue gas and fresh air is generally provided with mixing bellows.According to the different layout position is divided into pre - premix and post - premix.Pre-mixing is to arrange the mixing bellows in front of the blower, recirculating the flue gas and fresh air mixed, in the blower into the air, is sent to the burner to participate in combustion, in the mixed air into the air before the air duct set trap, exhaust condensed water, fan selection should also choose anti-corrosion fan.After premix, the mixed bellows are arranged in the blower, and the recirculated flue gas is fed into the mixed bellows through the recirculating blower, mixed with the fresh air from the blower, and sent to the burner for combustion.The commissioning condition of the blower should be good compared with the pre-premixed condition. However, a large amount of condensed water will be generated in the air duct, so the steam trap should be set at the low point of the mixing bellows and the smoke air duct.

  Maintenance

  The frame is fully movable; both the frame and the control system have full-open doors, so the machine can be maintained easily after moving the main frame forward and backward or opening those doors. Such quick and efficient maintenance service owes to the design experience of EBICO integration module system.

7.png

  From the perspective of heat transfer calculation, the measures to reduce the smoke exhaust temperature are analyzed from the following aspects: increasing the heat exchange surface, improving the heat exchange efficiency of the heating surface, improving the heat exchange temperature difference by using a lower temperature source, and reducing the influence of corrosion on the heat exchange efficiency.As gas boiler host first meet the low nitrogen flame furnace volume and size requirements, the second host of convection heating surface is a main export in order to reduce the smoke temperature, general control in 150 ~ 250 ° C, in order to avoid the smoke temperature increases along with the flue design difficulty of heat preservation, high smoking temperature is too low will cause corrosion in furnace convection heating surface forming wall condensation, therefore, furnace domestic demand to design proper heating surface, the physical dimension more representative chamber size.Increasing the heat exchange surface should mainly consider increasing the heat exchange area of the equipment in the rear of the boiler, which is more favorable for rapidly reducing the exhaust temperature.The second is to have a lower inlet water temperature can be used for heat exchange temperature difference characteristics;Third, corrosion resistant materials can be used to improve its service life.The new structure of efficient heat exchange mainly adopts the form of staggered tube arrangement, efficient heat exchange finned tube, plate heat exchanger, etc., to increase the flue gas disturbance and contact surface, reduce the heat resistance of flue gas stratification, and improve the heat exchange efficiency of medium and flue gas.

  New energy enterprises are not only the direct beneficiaries of clean energy consumption, but also important participants, bearing important responsibilities.Participate in the spot power market and auxiliary service market, improve the system dispatching ability in a market-oriented way, and promote the consumption of clean energy.

——Author:ebico