  I. incinerator inspection and acceptance

  1. All technical materials shall be in line with things;

  2. The surface shall be intact, and the building list shall be checked and accepted for all buildings and parts, and the building shall be completely intact;

  3. The supporting accessories and subordinate buildings shall be complete, and the specifications, models and numbers shall conform to the drawings. The valves, safety valves and pressure gauges shall have factory certificates;

  Preparation for two construction premises

  1. Clear the sundries in the garden and have superior construction space;

  2. The building site is flat;

  3. Close all valves.

  III. gas pipeline and valve placement

  1. Arrange according to the drawing of pipeline and valve, and carry out precision test for valves one by one;

  2. Conduct the pressure test to ensure the air tightness of the gas pipeline.

  IV. flue gas re circulation pipeline placement (only affected by the re Circulation Innovation Method)

  1. During the prefabrication of the flue gas and air duct, its size shall meet the requirements of the drawings, and the weld joint shall be subject to the fire oil leakage test, and the position and size of the bolt hole of the continuous flange shall be accurate;

  2. The flue support must be realized in advance before flue placement;

  3. The flange shall be padded with 3mm thick asbestos rubber plate to avoid air leakage.

  V. three aspects to be inspected before commissioning of incinerator

  1. Check whether the fuel oil (gas) is in place, whether the fuel oil (gas) pipeline is clean and circulating, and whether the valve has been opened;

  2. Whether there are signs of pipeline leakage and whether the pipeline is arranged reasonably.

  3. Vent from the pipeline in front of the fuel (gas) valve to ensure that there is no air inclusion in the pipeline, and the vent pipe shall be connected out of the room;

  Vi. commissioning of fuel (gas) incinerator

  1. Check whether the external fuel (gas) is in place, whether the pipeline is in circulation, and whether the external power supply is in place;

  2. Adjust the load of the incinerator to a small load, the combustion status response to a small load, close the large load for combustion and investigate the flame environment, and adjust the response of the credential environment to the approximate damper of the servo motor,

  3. When adjusting the fire force of the incinerator, it is necessary to adjust the load environment of the hot building from small load to large load gradually, and adjust the servo motor or damper according to the environment;

  4. Investigate whether the flame is partial or not, and whether there are signs such as insufficient flame burning and touch;

  5. After the mediation, it is necessary to hold repeated combustion to investigate whether the combustion is superior.

  VII. Fuel (gas) incinerator commissioning and after-sales attention

  1. When the fuel (gas) incinerator successively produces the failure of the secondary combustion method, it shall be shut down for search and inspection. If the gas supply system of the incinerator is normal and the circuit wiring is accurate, the incinerator can be restarted only after the obstacles are removed.

  2. It is strictly prohibited to knock or conflict the air supply pipeline with spanner or metal rod to avoid static electricity or sparks and to stimulate gas explosion.

  3. It is strictly prohibited to smoke, weld, cut, etc. at the air supply valve group or pipeline flange.

  4. It is strictly prohibited to conduct any open fire attempt near the pipeline, valve group and pressure regulating valve to avoid the occurrence of huge accidents.

  5. In the oil supply (gas) pipeline, the evacuation has been carried out, but there is residual gas or liquid drop on the pipe wall, which will cause burning and explosion if encountering, electrostatic spark and open fire.

  6. When the oil supply (gas) pipeline has been in the same period, and the valve group needs to be destroyed in case of obstruction, it is necessary to cut off the main valve at the front of the valve group at first, then vent the gas in the pipeline from the main valve to the valve group, and then the destruction and after-sale of the valve group can be carried out.

  7. It is not allowed to use non explosion-proof electrical tools on site.

  8. Before leak detection assembly, it is necessary to check the valve group.

  9. Before the start-up of the incinerator, it is necessary to make an air supply pressure test, check whether there is leakage, and make a simulation operation after confirming that it is normal.

  10. When the incinerator is not used, the customer is informed to cut off the main air supply valve and the main power supply switch.

  11. Initiate not to conduct the commissioning of the incinerator at night.

  12. At the end of commissioning, operators shall be trained to apply the operation bias, and the operation process shall be established when necessary